Application needs
Check contact resistance, cleanliness, particle shedding and corrosion requirements according to use; state conductivity and insulation targets separately.
Part types open for discussion
Connectors, precision structural parts and equipment components. This is an application evaluation direction and does not indicate that any specific customer project has been undertaken.
Prepare before evaluation
Substrate, soldering or contact requirements, cleaning conditions, cleanliness class and coating thickness tolerance.
From requirement to verification
- Submit drawings stating the substrate, quantity and operating conditions.
- Engineers check pretreatment, coating system, thickness and assembly requirements.
- Arrange sample verification as needed, and confirm quotation and acceptance conditions.
Source: company technical documents ↗ · compiled: 2026-09-18