AUTRA · PROCESS STUDIO 01 / Line planning
A production line,
starting from the substrate.
Choose a metal or non-metal substrate and a composite, alloy coating or pre-/post-treatment process to see the standard process sequence. Select chemicals station by station, enter temperatures and times, then bring the plan to AUTRA engineers.
First define your workpiece.
Depending on the substrate, the order of cleaning, activation and strike changes. The route below is for discussing the plan; the actual process is determined by the workpiece and the chemicals' technical documents.
Carbon steel / alloy steel process route
After cleaning and activation, enter the electroless nickel station.
Choose a station
Check step by step, from pretreatment to inspection.
Only selected steps are listed, in order. Click a step name to change its settings; optional stations are enabled above. Empty parameters are uniformly marked "To be confirmed".
| No. | Step | Product / chemical category | Simulated parameters | Function & points to confirm |
|---|
Bring the preliminary route to an engineer.
The list summarizes the products and settings you have chosen. After copying, you can paste it into the inquiry form; unfilled parameters are marked "To be confirmed".