Shanghai Autra Precision Surface Treatment Co., Ltd.

PEEK coating, MoS₂ spray coating & large-scale sandblasting

PEEK polymer coating, molybdenum disulfide dry-film coating and large-part blasting, evaluated by workpiece, operating conditions and acceptance requirements.

Choose the process by need

When parts need a polymer surface layer, dry-film lubrication, or surface cleaning and roughening of large parts, first choose the process by goal.

PEEK coating focuses on surface protection; MoS₂ coating on friction-pair lubrication; large-part blasting on cleaning and surface preparation before coating.

Quick comparison of three processes

On mobile, swipe left and right to see the full table.

ProcessMain useEvaluation focus
PEEK polymer coatingForms a polymer coating on metal part surfacesSubstrate heat resistance, film thickness, adhesion, masking and dimensional change
MoS₂ dry-film coatingDry-film lubrication of metal contact surfacesFriction pair, load, motion type, coating system and curing conditions
Large-part blastingSurface cleaning and roughening of large partsSize and weight, lifting, current surface condition, cleanliness and roughness
How to read this table

The three processes can be ordered separately or combined per project. The table gives selection directions; specific processes and acceptance criteria are agreed per drawing and sample.

PEEK polymer coating

Forms a PEEK polymer coating on metal workpiece surfaces, which can be evaluated for goals such as media resistance, surface protection and sliding contact. When using the powder coating route, surface preparation, spraying, melting and cooling must be determined by material data and workpiece structure.

Key points to confirm are substrate and heat treatment state, allowable thermal cycles, target thickness, masking areas and critical fit dimensions. Sample inspection covers coverage, adhesion, appearance and dimensional change after thermal cycling; bulk material properties cannot be taken directly as finished coating specifications.

MoS₂ dry-film coating

A dry-film coating with molybdenum disulfide as the solid lubricant, for discussing friction reduction, start-up lubrication and intermittent sliding of metal contact parts. The coating usually consists of a lubricant and a binder system; drying or curing conditions after spraying depend on the selected material.

When selecting, provide counterpart material, load, motion type, speed, operating temperature, contact media and allowable film thickness. Adhesion, thickness and actual friction and wear are confirmed on samples; the friction coefficient or temperature range of a single product is not applied.

Large-part blasting

For surface cleaning and roughening of large metal structural parts; rust, mill scale or old coatings can be removed as needed, and surfaces prepared for subsequent coating. Before blasting, contaminants such as grease should be removed first; abrasive and surface targets are then chosen by substrate, subsequent coating and acceptance requirements.

Please provide workpiece length, width, height, weight, lifting points, internal cavity and weld locations, current surface condition and target cleanliness or roughness. Whether the whole piece can be processed, whether zoned treatment is needed, and whether work is done on-site or in-plant must be confirmed with equipment working space, lifting conditions and samples.

How the three processes connect

PEEK and MoS₂ coatings can be evaluated by protection or lubrication goals respectively; large-part blasting can also serve as pretreatment for subsequent coatings. Whether to blast, and which abrasive and roughness to use, should be confirmed together with the adhesion requirements of the selected coating system.

When submitting drawings, please specify

  • Substrate grade, workpiece dimensions and weight, quantity, and areas to be treated or masked.
  • Target effect, operating temperature, contact media, load or wear mode.
  • Film thickness and dimensional tolerance, or post-blasting cleanliness, roughness and subsequent coating requirements.
  • Whether sampling is needed, inspection items and expected lead time.

To form a metal layer on a PEEK plastic substrate, see plastic surface metallization.

Limits of applicability

This page does not preset maximum equipment size or weight, nor promise uniform film thickness, temperature resistance or friction coefficient; processing scope and finished specifications are confirmed by the specific material, equipment conditions and sample inspection.

Selection notes

For protection needs, evaluate PEEK first; for dry-film friction reduction, MoS₂ first; for large-part cleaning or pre-coating treatment, blasting. Whether blasting is used as pre-coating treatment should be consistent with the surface requirements of the selected coating.